Basic facts about the proposed Constitution Pipeline, 2nd edition excerpted from Environmental Consistency Summary filed by Constitution Pipeline Company, LLC in December 2025.

Pipeline

Length124.77 miles
Diameter30 inches in diameter
Capacity650 million cubic feet a day* or 650,000 dekatherms a day; 1 Dth = 1 Mcf.  
Pressure, pounds
per square inch gauge
Maximum design: 1,480
Maximum operating: 1,440 
Kickoff, Turnpike Rd: 1,190 to 1,250
Terminus, Westfall Rd: 800 to 850

*Construction of a midstream compressor station could increase downstream pressure by about 200 psig, allowing greater capacity.

Above Ground Facilities

Meter & Regulation Stations

  • M&R Receipt Station, Turnpike Road, Brooklyn, Susquehanna Co. PA
    • Pig Launcher
    • Kickoff #1 MLV
  • M&R Delivery Station, Westfall Road, Wright, Schoharie Co. NY
    • Pig Receiver
    • Terminus #11 MLV

Main Line Valves between M&R Stations

# 2   Brushville Road, JacksonSusquehanna Co., PA
# 3   Vale Rd, SanfordBroome Co. NY
# 4   Obrien Rd, SanfordBroome Co. NY
# 5   Access Rd/Town Rd, MasonvilleDelaware Co. NY
# 6   VanTassell Road, FranklinDelaware Co. NY
# 7   Pumpkin Hollow Road, DavenportDelaware Co. NY
# 8   Clapper Hollow Road, SummitDelaware Co. NY
# 9   Cross Hill Road, RichmondvilleDelaware Co. NY
#10   Smith Rd, SchoharieSchoharie Co.  NY

Communications Towers (ten) co-located with MLVs

Main line valves and communication towers would fit within the 50 foot ROW.

Timeline

Permits issued Third quarter 2026
Begin constructionFourth quarter 2026 
In serviceFourth quarter 2027

Burial Depths of Pipeline

SoilTop is a minimum of 30 to 36 inches below surface
BedrockTop is a minimum of 18 inches below surface
AgriculturalTop is a minimum of 48 to 60 inches below surface

Land Required, Permanent

Kickoff facility3.06 acres
Pipeline ROW (50 foot width)758.31 acres
Access Roads90.65 acres
Terminus Facility2.29 acres
TOTAL855.31* acres

*Land required for Cathode Protection Ground Bed facility or facilities to be determined later

Land required during construction is more than twice this at 1,970.48 acres with wider ROW and contractor yards.

Constitution ROW, Width

75 feetwetland and water body areas
100 feetupland interior forested locations 
110 feetupland locations
125 feetactive agricultural areas

Contractor Yards, Temporary

120.0 acres938 Catlin Rd, Bridgewater, PA
3a11.1 acresUnion Church Road, Sidney, NY — KOA Campground
4a26.9 acres361 County Highway 58, Oneonta, NY
Cobleskill Stone Products
4d25.2 acres12871 State Highway 23, Davenport Center, NY
Gerster’s Triple E Towing & Repair
513.7 acres1238 State Route 7, Richmondville, NY
vacant lot
5a4.6 acres145 Podpadic Road, Richmondville, NY
Lancaster Construction
5d42.2 acres2 Van Buren Boulevard, Guilderland Center, NY
Northeastern Industrial Park
143.7 acres

Interconnections

  • Tennessee Gas Pipeline (TGP) 200 line in PA (?). Lateral to this line might be added later
  • Iroquois Gas Transmission System (IGTS) in NY
  • Tennessee Gas Pipeline (TGP) 300 line in NY

No longer part of the Constitution Pipeline II Project are: Central Compressor Station (Kingsley PA); Miller Compressor Station, White Road M&R Station, and Sutton Road M&R Station, (New Milford PA); Reynolds Discharge Pipeline; and the Southwestern Lateral.